Browse all practice questions for the On Site Sewage Systems Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

On Site Sewage Systems Practice Test course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • The daily design sanitary sewage flow for residential occupancy is calculated from which source?
  • What happens to the building’s performance level if the gross area is increased by 10%?
  • The hydraulic conductivity of the covering material must not be less than what value?
  • Which class uses a percolation time to determine the loading rate of the side walls?
  • What is the maximum CBOD concentration allowed in a Type B dispersal bed leachate?
  • If Class 4 sanitary sewage system cannot be installed on a new property and the owner wants to construct a Class 5 system, would a Class 5 be permitted under the Building Code in this situation?
  • In gravity-flow to the leaching bed, effluent movement is driven by which factor?
  • Must the mantle be placed in all directions from the absorption trenches?
  • What is the only system that may be constructed in soils with a T-time exceeding 50 minutes per centimeter?
  • What is the minimum depth below the ground surface required for absorption trenches?
  • How much backfill should you place over the leaching bed stone?
  • Which component in a filter bed has a minimum thickness of 30 cm?
  • In April, when choosing raised leaching bed fill materials under wet conditions, which material should be used, given both meet code?
  • Which dispersal bed type requires pressure distribution?
  • Which system does not require annual sampling of the effluent?
  • What is greywater?
  • Which statement accurately reflects the minimum extension for distribution piping in a conventional leaching bed when the calculated length is 35 m?
  • When assessing a leaching bed for potential sewage breakout, which observable condition would be a clear sign?
  • Which condition does not govern when you would use a raised leaching bed?
  • Which statement is true about the relative thickness of Type A bed layers?
  • Which statement is true about backfilling the septic tank area with granular material?
  • Which statement best describes the reason for soil structure identification during subsoil examination?
  • If the surface contours of a property vary from high to low, how is groundwater table depth expected to behave?
  • If a site slope is 30%, is benching of the underlying soil recommended?
  • Who must sign the application for a building permit for an on-site sanitary sewage system?
  • During which weather are soils with high T-times particularly difficult to handle?
  • Which of the following is an observation when identifying soils?
  • What is the required slope of the surface of the underlying stone layer in an absorption trench?
  • When constructing a raised leaching bed, which type of sand is preferable?
  • A raised leaching bed is considered when the high groundwater table is less than 900 mm from the ground surface.
  • Which system ensures even distribution of effluent over the entire bed area?
  • Which installation condition would raise serious concerns for a bed near groundwater?
  • Identify the Ontario Building Code Subsection that does NOT govern the shown construction.
  • What makes up the greatest part of sanitary sewage?
  • What volume of effluent should be pumped into the distribution lines at any one time?
  • Effluent reaches the leaching bed by gravity flow due to which mechanism?
  • Which dispersal bed type can be installed in slopes up to 25%?
  • Which of the following is the main component of the Type A dispersal bed?
  • What is the name of the formation that may cause soil clogging?
  • The overall principle behind soil structure examination is to understand how liquids move through the soil mass. Which option reflects this principle?
  • If sewage is smelled on a leaching bed, which observation points to a breakout?
  • What standard do Class 4 septic tanks and Class 5 holding tanks both conform to?
  • The maximum slope of the area upon which a leaching bed can be built is
  • What should the installer do if a boulder is encountered at the elevation where the tank will be placed?
  • If a Class 4 system is proposed, should you ask the property owner if there are any future additions or structures planned for the property?
  • Haulage of sewage is associated with which class of system?
  • Which statement best reflects future planning when considering a Class 4 system?
  • When must a building permit for an on-site sewage system be obtained?
  • Which role is barred from designing a Class 4 system?
  • A Type A dispersal bed receives effluent from what class of treatment unit?
  • What is the minimum hydraulic conductivity allowed for covering material?
  • Which of the following is NOT an example of a non-residential source of sanitary sewage?
  • If you smell sewage while standing on the leaching bed, which condition would indicate a sanitary sewage breakout?
  • What is the minimum size of a septic tank, in litres?
  • What is the minimum thickness for topsoil in a filter bed?
  • If the percolation time of the subsoils beneath a Class 2 sewage system is 40 min/cm, what is the loading rate of the side walls?
  • Who is ultimately responsible for the proper installation of the sewage system?
  • When investigating a sanitary sewage backup in a building, you discover that the liquid level in the septic tank is below the inlet pipe. What does this suggest?
  • Must the mantle be placed in all directions from the absorption trenches?
  • Class 4 septic tanks and Class 5 holding tanks must conform to which standard?
  • Identify the principle behind soil structure identification in subsoil examination.
  • Who is typically responsible for investigating complaints about malfunctioning septic systems?
  • From the holding tank example, how far is the tank from the property line?
  • Whose responsibility is it to provide for the design of a Class 4 sewage system?
  • What is placed below the distribution pipes?
  • How is the daily design sanitary sewage flow for a residential occupancy calculated?
  • Discharging sanitary sewage to the surface of the ground is considered unsafe.
  • Under certain conditions, which waste may go into a Class 1 system?
  • Why do Class 3 systems typically operate inefficiently for a short time?
  • Which dispersal bed type has a maximum bed width?
  • What is meant by a perched water table?
  • What is placed on top of the distribution pipes?
  • A septic tank filter is designed to filter particles of what size in millimeters and requires a minimum flow area of how many square centimeters?
  • Select a possible reason that could cause sanitary sewage to flow through a plumbing fixture into a building.
  • If effluent is introduced into a saturated soil mass, what is the likely outcome?
  • Is a septic tank allowed to be located 1.5 meters from a reservoir?
  • Which treatment level contains the least suspended solids and CBOD5?
  • Which of the following occurs in a septic tank?
  • What is the minimum thickness of filter sand in a filter bed installation?
  • What is the minimum thickness of the sand layer of a Type A dispersal bed?
  • In soils with very rapid percolation (less than 50 min/cm), a 900 mm clearance distance would be unnecessary.
  • Which statement best describes the influence of sewage quality on dosing pump selection?
  • What material should be used to backfill the void around the septic tank after removing an obstruction?
  • When analyzing the percolation times from tests, you take
  • In the holding tank example, which distance is cited as being too close to the uncased water supply well?
  • Does a Class 1 system require a building permit?
  • What is one of the biggest dangers when entering the confined space of a pumped-out holding tank?
  • Which treatment level contains less suspended solids and lower CBOD5?
  • In a Type A dispersal bed, the sand layer has a minimum thickness of 300 mm and the stone layer has 200 mm. By how many millimeters does the sand layer minimum exceed the stone layer minimum?
  • During the site evaluation of a lot, a test pit should be located and dug
  • In a septic tank, where do oils and grease accumulate?
  • In which practice should you request a grading sample from the truck driver to ensure proper sand grading?
  • Where the underlying soil has a percolation time of 20 minutes, what is the minimum area of a Type B dispersal bed if the total daily design flow is 1 600 L?
  • The Class 5 system is described as hauling sewage and includes sanitary sewage that comprises which components?
  • When a truck brings a new load of sand to the site, what should you ask for to ensure proper grading?
  • What is the acceptable range for topsoil thickness in a filter bed installation?
  • For residential systems, which quantity determines the septic tank minimum size?
  • If there are excessive fissures (cracks) in the bedrock underlying the raised bed, what can you do?
  • Which layer has a minimum thickness of 200 mm in a Type A dispersal bed?
  • What is the minimum required thickness of soil or leaching bed fill along sides and bottom of a pit privy?
  • Is it considered good practice to use the same sand materials for both the mantle and the leaching bed in raised beds?
  • If a single on-site system is designed to serve both yourself and a neighbor on a separate lot and meets all design regulations, can you obtain a building permit?
  • What is a possible way a groundwater contamination plume can be formed beneath a leaching bed?
  • Which condition makes a sewage system unsafe?
  • From the holding tank example, how close is the tank to the house?
  • What percolation time provides the best treatment of sewage in the soil?
  • From the holding tank example, how far is the tank from the natural spring source?
  • What is the maximum allowable elevation variation across the subgrade beneath a sand filter bed?
  • What material is placed both below and above the distribution pipes?
  • A distribution box is preferred when there are more than how many lines of distribution piping?
  • What T time should be used to design the trenches for a fully raised leaching bed?
  • Would you actually fill a tank with water prior to placing the backfill?
  • How much distance must there be between the high groundwater table and the bottom of the pit in a Class 2 system?
  • During site evaluation for a leaching bed, which two conditions must you determine?
  • During site evaluation, you must determine whether the high groundwater table is within what distance from the bottom of the proposed trenches?
  • What side slope should the walls of the test pit have to safely observe soils?
  • Should the alarm be configured to trigger before the tank reaches full capacity?
  • Can a leaching bed service two adjoining properties located on separate lots?
  • What is the acceptable percolation time range for shallow buried trench systems?
  • Which statement correctly describes greywater?
  • In a shallow buried trench system, can the piping be less than in a conventional leaching bed?
  • Which of the following systems can accept both human waste and greywater waste?
  • Should the setting in a tank that sounds the alarm be set below the full capacity of the tank?
  • What statement best describes the relationship between rod reading and ground elevation in survey leveling?
  • Is it advisable to pregrade the site of a conventional leaching bed to an elevation 300-400 mm below the finished grade?
  • Is a third wire a requirement for all electrical equipment used on the site?
  • What should be left uncovered after installing a sewage system and before placing the backfill and topsoil?
  • If 10% of grain sizes pass the #200 sieve, what should be done with the material used as filter sand?
  • What happens to effluent as it percolates into the soil?
  • Which commercial enterprise causes the fewest problems for a septic system?
  • When a boulder is encountered at the tank elevation, which sequence of actions is recommended?
  • Why is identifying soil structure during subsoil examination important?
  • A shallow buried trench system is the only system that can be used when the percolation time of the soil is between
  • What is the maximum thickness of leaching bed fill that can be properly compacted by a tracked bulldozer?
  • In groundwater or surface water, which is not a parameter you should test for to indicate groundwater pollution?
  • If sample results exceed the acceptable concentration, within what time frame must a resample be completed?
  • What is the minimum soil depth between the high groundwater table and the bottom of an earth pit privy?
  • What is the required clearance distance of distribution piping to a structure?
  • The site being evaluated has a natural slope to the land of 12%. To install a conventional leaching bed, the best construction practice may involve:
  • In a perched water table, where is free water located?
  • When is more than one test pit recommended?
  • In constructing a raised leaching bed, after removing the topsoil and digging a shallow depression, what is the next task?
  • Maximum effluent concentrations are measured in which units, using a 30-day averaging period?
  • What is the purpose of the timer on the pump in a pressurized system?
  • In a shallow buried trench system, the distribution pipe length should be at least how many metres?
  • When choosing a pump for a dosing system, which considerations should be taken into account?
  • Which point has a lower elevation, given two rod readings 3.5 m and 4.0 m from the same level?
  • What occurs in the biomass layer within a leach field?
  • If rain begins lightly after backfilling, what should you do?
  • What should you observe when identifying soils?
  • When determining the elevation of the float switch of the alarm for a Class 5 sewage system, which items must be considered?
  • When is it good practice to bench the underlying soil?
  • Compared with a septic tank without an effluent filter, the effluent from a septic tank with a filter is:
  • What are the maximum concentrations of effluent permitted when a leaching bed is constructed as a Type B dispersal bed?
  • The percolation time for soil beneath a proposed leaching bed is 25 min/cm. How far from a reservoir can this bed not be located?
  • Should the distribution pipes in a filter bed leaching bed be evenly spaced?
  • Is a percolation time, determined by a percolation test, considered to be
  • Which factor is specifically associated with friction loss in piping for dosing systems?
  • What is the minimum thickness of stone and pipe in a filter bed installation?
  • Which of the following could cause sanitary sewage to flow into a building due to a leaching bed issue?
  • How high should soil be mounded around the sides of the superstructure in a vault privy and an earth pit privy?
  • To which class of sewage systems do the operation and maintenance requirements apply?
  • What material is placed above the distribution pipes?
  • Who is responsible for seeing that the approved material is being placed in a raised leaching bed and mantle?
  • Which class of treatment unit supplies effluent to a Type A dispersal bed?
  • A Type B dispersal bed receives effluent from which treatment unit?
  • Which component has the largest minimum thickness among filter bed components?
  • The distribution pipe length requirement in a shallow buried trench system is at least how many metres?
  • In a shallow buried trench system, the distribution pipe should be at least how long?
  • The stone layer is required to be what shape installed perpendicular to the slope?
  • Would an inspector approve the following holding tank siting? 10 m from an uncased water supply well, 7 m from the house, 5 m from the property line, and 35 m from a natural spring source.
  • It necessary for all the electrical equipment that you use or install on the site to have a third wire.
  • During site evaluation, the test pit should be located at the location of the proposed leaching bed.
  • In a shallow buried absorption trench system, what is the minimum length of a distribution pipe?
  • How often must the pressure head of a pressurized system be checked for compliance?
  • What is the minimum pressure head required on a shallow buried trench system?
  • In a septic tank, what happens to solids?
  • In a septic tank, what happens to liquids relative to solids?
  • If the T-time in the soil underlying the proposed leaching bed is 55 minutes per centimeter, which of the following can you NOT do?
  • A Type B dispersal bed receives effluent from what type of treatment unit?
  • What is the allowed range of percolation time for a shallow buried trench system?
  • Are inspectors covered under the regulations of the Occupational Health and Safety Act when inspecting an on-site sewage system?
  • Which soil condition would preclude installing a bed?
  • During wet months, which fill material is recommended for the raised leaching bed to ensure good performance?
  • What units are used for maximum effluent concentrations?
  • How close to a lake can an earth pit privy be located?
  • What is the minimum thickness of the stone layer of a Type A dispersal bed?
  • What does it tell you if you are able to roll a long thin ribbon of clay between your fingers without the clay crumbling?
  • For non-residential systems, what multiplier is used to size the septic tank relative to daily design sanitary sewage flow?
  • Which of the following lengths meets the minimum distribution pipe length requirement in a shallow buried trench system?
  • A test pit is dug to:
  • Why should the backfill be porous?
  • CAN3-B66 applies to which equipment?
  • Who investigates complaints about malfunctioning systems?
  • Which waste can go into a Class 1 system?
  • Which party is not specified as a signatory for the permit application?
  • For gravity flow distribution systems, the bottom of the distribution pipes should be installed with what slope?
  • You can move the level after you take both a foresight and a backsight.
  • A highly permeable soil indicates that the soil mass has
  • If a worker has to go into the excavation to compact the granular fill, what are the steepest side slopes allowed under the Occupational Health and Safety Act?
  • Identify the best practice per the material: why examine soil structure during subsoil examination?
  • Who is not permitted to design a Class 4 system?
  • What is identified as the biggest cause of groundwater contamination from a leaching bed?
  • Which soil condition would indicate that a bed installation is not advisable due to proximity to groundwater?
  • What is the recommended maximum compacted thickness of leaching bed fill per pass when using a tracked bulldozer?
  • What hazard does groundwater mounding into a leaching bed pose?
  • Which dispersal bed type requires pressure distribution?
  • On a leaching bed, if you detect sewage odor, what is a key sign to look for indicating breakout?
  • Which of the following systems has a leaching bed as a way to dispose waste?
  • Under what conditions would you decide to use a granular material to backfill around the septic tank, once it is placed in the hole?
  • Which statement best reflects the importance of soil structure identification during subsoil examination?
  • For gravity flow distribution pipes, how should they be installed in absorption trenches?
  • Mounding of the groundwater table beneath a leaching bed may cause
  • Can you connect a downpipe from a roof eave into the inlet pipe of the septic tank?
  • The total daily design sanitary sewage flow above which a treatment unit must be used with a filter bed system is
  • How many percolation tests must be carried out if this procedure is used?
  • Where is the biomat formed in a septic system?
  • A raised leaching bed is considered under which condition?
  • A test pit is dug to observe which of the following?
  • Where is a 900 mm clearance distance unnecessary?
  • What minimum distance should be maintained between an Earth Privy and a well with watertight casing to a depth of 4 meters?
  • Which condition is the most common cause of groundwater contamination when using a leaching bed?
  • How long will this pumping take?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy